0% 5h quota used · resets in 2h live · 08/09/2026 12:13 CEST

tn:seo-fixes

Run 2026-07-02T17-13-40-6d6c7e, 2mo ago.

Outcome ok
stopped: completed
Cost $5.07
API-equivalent
Took 9m
budget 60m
Turns 84
budget 100

What the agent said it did

its own words, from the run log

Everything is complete and correctly staged for review.

Outcome: Implemented all 5 top actions from the 2026-07-02 SEO audit for tunisie-electricite.com on branch countryos/tn/2026-07-02-seo-fixes (4 commits, 15 files) — trimmed 10 meta descriptions to ≤160 chars, added BreadcrumbList JSON-LD to the 3 annuaire templates (286 pages) and /tarifs-gaz, wove contextual internal links into 5 thin pages, and shortened 2 outlier titles. The branch was not pushed (propose phase only); full details and before/after diffs are in /app/countries/tn/proposals/seo-fixes/2026-07-02T17-13-40-6d6c7e/summary.md, and the run journal was updated with a key lesson (re-measure char counts live, don't trust the audit report's numbers — some had already drifted under threshold).

Run record

Run id
2026-07-02T17-13-40-6d6c7e
Task
tn:seo-fixes
Workspace
tn
Phase
propose
Model
sonnet
Started
02/07/2026 19:23
Session
dc91aea0-f354-432e-94c9-28e8bd5abcee
Exit code
0
Tokens
14,419 in · 45,847 out · 10,708,014 cache read

The journal entry this run wrote

in the journal · matched by run id 6d6c7e

Applied the human-approved proposal from proposals/seo-fixes/2026-07-02T17-13-40-6d6c7e/summary.md exactly per its "Apply-phase steps": the 4 commits were already sitting on countryos/tn/2026-07-02-seo-fixes (created during the propose phase), so this run only pushed the branch (git push -u origin ...) and opened a draft PR to develop: https://github.com/Selectra-Dev/cms/pull/8895. Did not touch any other branch, did not merge, did not mark ready.

Note: by the time this ran, origin/develop had moved 2 commits ahead of the branch's base (81ef93f328) with unrelated work — normal divergence (base is still an ancestor, merge-base --is-ancestor confirmed), not a real conflict. No rebase was needed; pushed as-is.

Next run: once a human reviews PR #8895 (merge or close), re-run /seo-audit for a fresh baseline, then look at the "nice-to-have" items noted in the proposal (ogImage site-wide, FAQ accordions on /steg/* subpages, and the Closure-route route:cache issue in sites/tunisie-electricite.com/routes/web.php — flagged twice now, still unaddressed, worth its own task).

The proposal it wrote for approval

approved · decided 02/07/2026 19:40

SEO fixes proposal — tunisie-electricite.com — 2026-07-02

Branch: countryos/tn/2026-07-02-seo-fixes (based on origin/develop @ 81ef93f3) Status: proposed, not pushed, not merged. Awaiting human approval. Source report: reports/2026-07-02-seo-audit.md (only audit on file; first /seo-fixes run).

What changed and why

Implemented the "Top 5 actions" from the audit, all mechanical/low-risk per the /seo-fixes scope rules (meta/title trims, structured data matching existing patterns, contextual internal links). Nothing in the audit's out-of-scope list (body rewrites, new pages, data-file changes) was touched.

Before implementing, every finding was re-verified live against the current Blade sources (not just trusted from the report, since content may have shifted slightly since the audit ran) — exact current lengths were measured with a small Node script rather than eyeballed. Two things had already drifted under the audit's 160-char threshold since the report was written (/tarifs-gaz at 159 and /mentions-legales at 159) and were left untouched; /steg/coupures's meta description was also already at 158, so only its title (81 chars) needed shortening, not its description.

Commit 1 — f57bacdad6 trim meta descriptions to ≤160 chars

10 pages had a meta description over the guideline (159–215 chars measured live). Trimmed each to ≤160 while preserving meaning and the CTA:

Page Before (chars) After (chars)
/tarifs 169 140
/steg 189 157
/coupures 215 156
/steg/numero-vert 184 148
/steg/facture 198 153
/steg/raccordement 189 149
/steg/raccordement-gaz 176 154
/steg/service-client 177 146
/steg/solaire 171 149
/ (homepage) 189 148

Skipped (already ≤160, no change needed): /tarifs-gaz (159), /mentions-legales (159), /steg/coupures (158).

Commit 2 — 20bbc3fcc0 add BreadcrumbList JSON-LD to annuaire templates

The 3 directory templates (annuaire/_index, annuaire/_gouvernorat, annuaire/_delegation — 1 + 24 + 261 = 286 generated pages) had a visual breadcrumb but no structured data, unlike 10/13 static pages. Added BreadcrumbList JSON-LD to each, copying the exact @push('head') / json_encode(..., JSON_UNESCAPED_SLASHES | JSON_UNESCAPED_UNICODE) pattern already used on /tarifs and the steg/* pages, built from the same crumbs each template's visual <nav> already renders (so the two can never drift apart):

  • _index: Accueil › Annuaire
  • _gouvernorat: Accueil › Annuaire › {gouvernorat}
  • _delegation: Accueil › Annuaire › {gouvernorat} › {délégation}, using the real page URL /{gouvernorat}/{delegation} (not /annuaire/{g}/{d} — see the routing note logged in a prior run's journal entry).

Commit 3 — b733c0fd59 weave contextual internal links into thin pages

  • Homepage (/): added one sentence in the "STEG core info" section linking to /steg, /tarifs, /tarifs-gaz, /coupures — previously zero body links to the site's own core sections from its highest-authority page.
  • /steg/coupures: went from 0 → 4 body links (/steg/numero-vert in the intro, /coupures after the "que faire" list, /annuaire on "district STEG", /steg/service-client on the coupures-programmées paragraph).
  • /steg/solaire: went from 0 → 3 body links (/steg, /steg/facture, /tarifs).
  • /steg/raccordement-gaz: went from 1 → 3 body links (added /annuaire and /steg/raccordement).
  • /steg/service-client: went from 1 → 3 body links (added /steg/numero-vert, /steg/facture, /steg/raccordement).

All links were woven into existing sentences or added as one short natural sentence, per the skill's scope rule — no bare link lists were dumped into any page. Every target URL was checked against routes/web.php and already exists and is already linked from elsewhere on the site.

Commit 4 — 1efaf57eba shorten outlier titles, add breadcrumb to /tarifs-gaz

  • /steg title: 78 → 52 chars ("STEG — Société Tunisienne de l'Électricité et du Gaz | Présentation et contact" → "STEG — Société Tunisienne de l'Électricité et du Gaz").
  • /steg/coupures title: 81 → 50 chars ("Coupure d'électricité ou de gaz STEG — Numéro vert 80 100 444 et conduite à tenir" → "Coupure d'électricité ou de gaz STEG : que faire ?").
  • /tarifs-gaz: added the same BreadcrumbList JSON-LD its sibling /tarifs already has (was previously missing entirely, matching the audit's action #5 note).

Diff summary

4 commits, 15 files changed, 76 insertions(+), 23 deletions(-)

Quality checks performed

  • Tag/directive balance re-checked on every touched file (@php/@endphp, @push/@endpush, <section>/</section>, <article>/</article>, <div>/</div>, <a>/</a>, <li>/</li>, <p>/</p>) — all balanced.
  • Every trimmed meta description re-measured programmatically (not eyeballed) and confirmed ≤160 chars.
  • Both shortened titles re-measured and confirmed well under 65 chars.
  • All new internal-link targets cross-checked against sites/tunisie-electricite.com/routes/web.php and confirmed to resolve to an existing page.
  • No local dev environment was available in this run (no Sail/Docker), so no live HTTP 200 render check was performed — flagged for the apply phase or a human reviewer to verify before merge.

Skipped / out-of-scope (needs separate task)

  • Site-wide: no ogImage is set anywhere, so social share previews are blank. Not mechanical (needs image assets) — separate task.
  • Most /steg/* subpages have natural Q&A content but no <x-accordion :schema> FAQ block (only /tarifs, /coupures, /steg/numero-vert have one). Adding FAQ content is editorial, not mechanical — separate task.
  • Unrelated finding, out of this skill's scope: routes/web.php for this site defines several routes with Closure actions (/annuaire, /annuaire/{gouvernorat}, /{gouvernorat}/{delegation}, /{gouvernorat}), which per this repo's CLAUDE.md disables route:cache platform-wide. This is a pre-existing routing issue unrelated to SEO content and was left untouched — worth flagging to a human as a separate engineering task.

Apply-phase steps (do not run until approved)

  1. Confirm APPROVAL_TOKEN is set.
  2. git push -u origin countryos/tn/2026-07-02-seo-fixes
  3. gh pr create --base develop --title "[tn] SEO fixes 2026-07-02" --body-file <this summary>
  4. Report the PR URL back to the human reviewer.

Log

data/logs/tn-seo-fixes-2026-07-02T17-13-40-6d6c7e.log · 2,633 bytes
stdout
{"type":"result","subtype":"success","is_error":false,"api_error_status":null,"duration_ms":573450,"duration_api_ms":539729,"ttft_ms":19905,"ttft_stream_ms":19572,"time_to_request_ms":16363,"num_turns":84,"result":"Everything is complete and correctly staged for review.\n\n**Outcome:** Implemented all 5 top actions from the 2026-07-02 SEO audit for tunisie-electricite.com on branch `countryos/tn/2026-07-02-seo-fixes` (4 commits, 15 files) — trimmed 10 meta descriptions to ≤160 chars, added BreadcrumbList JSON-LD to the 3 annuaire templates (286 pages) and `/tarifs-gaz`, wove contextual internal links into 5 thin pages, and shortened 2 outlier titles. The branch was **not pushed** (propose phase only); full details and before/after diffs are in `/app/countries/tn/proposals/seo-fixes/2026-07-02T17-13-40-6d6c7e/summary.md`, and the run journal was updated with a key lesson (re-measure char counts live, don't trust the audit report's numbers — some had already drifted under threshold).","stop_reason":"end_turn","session_id":"dc91aea0-f354-432e-94c9-28e8bd5abcee","total_cost_usd":5.0639852,"usage":{"input_tokens":14419,"cache_creation_input_tokens":186622,"cache_read_input_tokens":10708014,"output_tokens":45847,"server_tool_use":{"web_search_requests":0,"web_fetch_requests":0},"service_tier":"standard","cache_creation":{"ephemeral_1h_input_tokens":186622,"ephemeral_5m_input_tokens":0},"inference_geo":"not_available","iterations":[{"input_tokens":2,"output_tokens":319,"cache_read_input_tokens":209092,"cache_creation_input_tokens":585,"cache_creation":{"ephemeral_5m_input_tokens":0,"ephemeral_1h_input_tokens":585},"type":"message"}],"speed":"standard"},"modelUsage":{"claude-haiku-4-5-20251001":{"inputTokens":807,"outputTokens":16,"cacheReadInputTokens":0,"cacheCreationInputTokens":0,"webSearchRequests":0,"costUSD":0.000887,"contextWindow":200000,"maxOutputTokens":32000},"claude-sonnet-5":{"inputTokens":14419,"outputTokens":45847,"cacheReadInputTokens":10708014,"cacheCreationInputTokens":186622,"webSearchRequests":0,"costUSD":5.063098200000001,"contextWindow":1000000,"maxOutputTokens":64000}},"permission_denials":[],"terminal_reason":"completed","fast_mode_state":"off","uuid":"355444e4-658d-4031-a0e6-7981aca53ce5"}
stderr
Ignoring 3 permissions.allow entries from .claude/settings.json: this workspace has not been trusted. Run Claude Code interactively here once and accept the trust dialog, or set projects["/app/data/workspaces/cms"].hasTrustDialogAccepted: true in /home/node/.claude.json.